The project I selected is the Bus Stop From the Future. As a group member, I think I did my work very well. I uploaded my ideas and work on both Facebook and Blogger weekly. In the studio on Wednesday, I always participate in the group discussion in order to improve the bus stop design.
Till now, although I had done many detail designs, Hank seems like not very satisfy with our work. I think the project changed a lot during the mid-term break after the discussion with Hank. I uploaded the work I did weekly on Blogger, although it may be not so useful in the further design. As a group member, my major work is on connections and joints.
Individual Milestone
Bus stop research.
These are from Bus Infrastructure Guidelines -Issue 2
Gantt Chart.
The Gantt Chart was discussed in studio and created by Jason Lo
Planning Presentation.
ARCH1392 Bus Stop of the Future Planning Presentation
Laser cutting prototype.
Working with the other group members, we made a prototype to test the connection of the roof parts.
Weekly meeting.
Here are some notes written by Hank during the mid-term break. The connection details had been changed a lot from my original understanding.
Connection.
All the Skechup files below were created by myself. Some of those were designed after discussion and I made the Sketchup file after.
Connection Research.
Detail Drawings.
I was assigned to work on the third detail drawings after the meeting with Hank.
The detail 3 is ROOF DETAIL: TOP VIEW OF END OF CANOPY.









No comments:
Post a Comment